A Student-Built House Is Slowly Filling Out in Silver Spring

Discussion Policy
Comments that include profanity or personal attacks or other inappropriate comments or material will be removed from the site. Additionally, entries that are unsigned or contain "signatures" by someone other than the actual author will be removed. Finally, we will take steps to block users who violate any of our posting standards, terms of use or privacy policies or any other policies governing this site. Please review the full rules governing commentaries and discussions. You are fully responsible for the content that you post.
Sunday, March 12, 2006

For a while, it resembled a teenager who had just gone through a growth spurt. The bones of the student-built house at 13009 Connecticut Ave. in Silver Spring were there, but the rest of it was still a bit awkward, even gangly.

Slowly, the house is beginning to bulk up. The taupe-colored siding is on. Inside, puffy blankets of insulation poke through the wooden frames that separate the rooms. This week, carpentry students are installing drywall. In another week, they'll start painting. By the end of March, kitchen cabinets will be in.

The kids are leaving their marks on the project -- not just with the hundreds of nails they've driven into boards but also with permanent markers. Near the second-floor bathroom, Stephen Haynie, a junior at Sherwood High School, scribbled his name in black -- along with his phone number (his girlfriend doesn't know) -- on a beam. Juan Martinez of Montgomery Blair High School scribbled "Juan was here!" near the upstairs bedroom.

Six weeks behind in the fall, the house will be right on schedule in the spring. By early May, it is slated to be finished.



© 2006 The Washington Post Company