Permits requested:
1. Marriott Wardman Park, 2600 Woodley Rd. NW. Renovation of existing restaurant. $1.12 million.
2. Potomac Place, 800 Fourth St. SW. Interior alteration and repair of first through ninth floors in existing apartment building. Cost: $15.7 million.
3. Residential building, 1100 First St. SE. Construction of 14-story, 260-unit building with four levels of underground parking. Cost: $40 million.
4. Franklin Square North, 1100 13th St. NW. Renovation of offices on second and third floors of office building. Cost: $1.78 million.
5. Row houses, 608-612 Maryland Ave. NE. Construction of three three-story row houses with English basements. Cost: $800,000 each.
6. Condominium building, 1939 12th St. NW. Construction of townhouse condominiums. Cost: $5.38 million.
7. Gallaudet University, 800 Florida Ave. NE. Construction of James Lee Sorenson Language and Communication Center. Cost: $15 million.
8. Condominium building, 919 12th St. NE. Construction of 16 condominiums. Cost: $1.5 million.
9. Pumping station, 1801 Minnesota Ave. SE. Construction of pumping station to house 12 pumps. Cost: $4.5 million.
10. Moultrie Courthouse, 500 Indiana Ave. NW. Interior renovation of annex, including upgrading of sprinkler and fire alarm systems. Cost: $4.06 million.
11. Apartment building, 909 New Jersey Ave. SE. Construction of 13-story apartment building with retail areas. Cost: $35 million.
12. Pumping station, 5000 Overlook Dr. SW. Upgrading of pump station for raw wastewater. Cost: $7 million.
Permits issued:13. Rose School, 821 Howard Rd. SE. Installation of standby generator. Cost: $70,500.
14. Washington Marriott, 1221 22nd St. NW. Upgrading of fire alarm system at hotel. Cost: $285,000.
15. Mazza Gallerie, 5300 Wisconsin Ave. NW. Selective demolition and renovation to mall including new facade, awning and projection. Cost: $690,000.
16. New building, 401 Massachusetts Ave. NW. Construction of building at former car sales and rental lot. Cost: $7.19 million.
17. Brentwood Rail Yard, 601 T St. NE. Expansion of rail yard capacity to accommodate more train cars. Two permits: $10.72 million and $30,000.
18. Office building, 2121 K St. NW. Construction of three-story addition to an eight-story office building. Cost: $9.5 million.
19. National Cathedral, 3101 Wisconsin Ave. NW. Construction of underground garage. Cost: $2 million.
20. Coeus International School, 4401 Connecticut Ave. NW. Renovation of sixth floor for school to accommodate 150 students and 12 staff members. Cost: $170,000.
21. Southern Court, 845 Chesapeake St. SE. Remodeling of an apartment building. Cost: $1.65 million.
22. Exxon, 4244 Wisconsin Ave. NW. Upgrading of tank systems at 15 gas stations throughout the city. Fifteen permits: $1,000-$3,500.