Iraqi Dam Seen In Danger of Deadly Collapse

Water rushes down a spillway at Mosul Dam. As engineers monitor the structure to determine leakage, machines constantly pump grout deep into its base.
Water rushes down a spillway at Mosul Dam. As engineers monitor the structure to determine leakage, machines constantly pump grout deep into its base. (U.s. Army Corps Of Engineers)
Discussion Policy
Comments that include profanity or personal attacks or other inappropriate comments or material will be removed from the site. Additionally, entries that are unsigned or contain "signatures" by someone other than the actual author will be removed. Finally, we will take steps to block users who violate any of our posting standards, terms of use or privacy policies or any other policies governing this site. Please review the full rules governing commentaries and discussions. You are fully responsible for the content that you post.

Seepage from the dam funnels into a gushing stream of water that engineers monitor to determine the severity of the leakage. Twenty-four clanging machines churn 24 hours a day to pump grout deep into the dam's base. And sinkholes form periodically as the gypsum dissolves beneath the structure.

"You cannot find any other dam in the world like this," said Ayoub, a mustachioed man in a dark business suit who has worked at the dam since 1983 and has managed it since 1989.

About two years ago, Ayoub became concerned that the pressure of the water was putting the dam at risk of failure. So he ordered that the dam's water level, which can reach 330 meters above sea level, not exceed 319 meters.

But reports prepared by the Army Corps of Engineers began to raise new alarms.

"Mosul Dam is 'unsafe' in any definition," the PowerPoint presentation said. It added: "Condition continually degrading" and "Failure mode is credible." Under a section labeled "Consequences of Failure," it says: "Mass civilian fatalities."

Ayoub said U.S. officials spoke in person about the dam in even more apocalyptic terms. "They went to the Ministry of Water Resources and told them that the dam could collapse any day," he said.

The report so alarmed the governor of Nineveh province, where the dam is located, that he asked that it be drained of all water immediately, Ayoub said.

Ayoub said he agrees that the most catastrophic collapse of the dam could kill 500,000 people, but he said U.S. officials have not convinced him that the structure is at high risk of collapse. "The Americans may very well be right about the danger," Ayoub said. "I think it is safe enough that my office is in the flood plain."

In an interview Monday night, Abdul Latif Rashid, Iraq's minister of water resources, said that he believed the safety situation was not critical and that he was more inclined to trust his engineers than American reports.

"Is the dam going to collapse tomorrow?" Rashid said. "I can't tell you that. Let us hope that we avoid a disaster and focus now on a solution."

The Army Corps has recommended that a partially constructed dam at Badush, which lies between Mosul Dam and the city, be finished as a stopgap measure in case Mosul Dam collapses.

But Salar Bakir Sami, director general of planning and development at the Water Resources Ministry, said Iraqi government officials do not think it is necessary to spend the estimated $10 billion for such a project. Instead, he said, the ministry planned to spend $300 million to construct a smaller version of the Badush dam that would generate electricity and provide irrigation, but not serve as a safety valve in case Mosul Dam breaks.

Rashid said his top priority is to fix Mosul Dam by building a concrete wall at its foundation that should shore up the design and provide "a permanent solution." He said experts have just discovered cutting-edge technology that would allow such a wall to be built, perhaps with construction starting by next year at a cost of less than $1 billion.

In the report to be released Tuesday, the Office of the Special Inspector General for Iraq Reconstruction, a federal oversight agency, found that little of the reconstruction effort led by the U.S. Embassy has succeeded in improving the dam. The office reviewed contracts worth $27 million, but an embassy official said the total cost of the project was $34 million.

The review found that a Turkish company, which was paid $635,000 for a contract awarded 19 months ago to build storage silos for cement, had done so little and such poor-quality work that its project may have to be restarted. One company contracted to design grout-mixing plants instead submitted plans for unusable concrete-mixing plants. High-tech equipment meant to help grouting is gathering dust because it won't work, according to investigators.

Embassy and Army Corps officials noted that it has been difficult to conduct oversight of the project because it is in a dangerous area. They said that contracts with the worst businesses have been terminated and that steps have been taken to ensure better management of the project in the future.

"Our focus is on whether the project that the Corps undertook got carried out and the answer to that question is no," said Stuart W. Bowen Jr., the special inspector general. "The expenditures of the money have yielded no benefit yet."


<       2


More Iraq Coverage

Big Bombings

Big Bombings

Interactive: Track some of the deadliest attacks in Iraq.
Full Coverage

facebook

Connect Online

Share and comment on Post world news on Facebook and Twitter.

Note: Please upgrade your Flash plug-in to view our enhanced content.

Casualties Widget

Track Iraq casualties on your own Web site.
Widget: Iraq News

© 2007 The Washington Post Company