Mandatory testing

The contractor that is building the first 11.7 miles of the Metrorail extension will be required to test all 11 of the 32-year-old pier foundations that will be used to support the Silver Line's elevated guideway over Interstate 66 and the Orange Line.


© 2009 The Washington Post Company