» This Story:Read +|Watch +| Comments
» This Story:Read +|Watch +| Comments

New landscape on the Mall

The flood zone project will add berms and about a 450-foot-long post-and-panel system that would protect a swath of the Mall from extreme floods. Construction will begin in a few weeks and should be completed next summer.

 New landscape on the Mall

This Story
A wall on the Mall protects against a long shot
Article | Eighty thousand cubic yards of dirt. Thirty steel girders. An eight-foot-high concrete wall.
This Story
Flood plan proposed to protect Washington Mall
Article | Eighty thousand cubic yards of dirt. Thirty steel girders. An eight-foot-high concrete wall.

Network News

X Profile
View More Activity
» This Story:Read +|Watch +| Comments
» This Story:Read +|Watch +| Comments
© 2010 The Washington Post Company